Construction and installation of 143 turbines, 90 megawatts at Badi Manjil, Herzvil and Siahpoosh wind sites.
Construction and installation of 43 turbines of 660 kilowatts, 4.28 megawatts at Badi Binload site
Construction and installation of 10 turbines of 660 kW, 6.6 MW in Tabriz, Ardabil, Nair, Sarab, Shiraz, Isfahan, Mahshahr, Zabol
Construction and installation of 4 turbines of 660 kW, 64.2 MW at the Pushkin Pass wind site
Construction and installation of 2 turbines of 710 kilowatts, 1.42 megawatts at the Badi Khaov site
Construction and installation of 3 turbines of 660 kilowatts, 1.98 megawatts at the Badi Khaov site
Major repairs of 45 660 kW wind turbines
Major repairs of 20 660 kW wind turbines

ongoing projects

  • Construction and installation of 34 wind turbines, 22/44 MW
  • Construction and installation of 2 turbines of 710 kilowatts, 1.42 megawatts at the Badi Khaov site
  • Construction and installation of 1 660 kW turbine at the Badi Khaf site
  • Overhaul and service of 4 660 kW turbines at the Pushkin Pass site in Armenia
  • Major repairs and service of 18 + 23 660 kW turbines on Manjil and Binload site